Jamestown – The Cable has Landed
| | | | | | |

Jamestown – The Cable has Landed

On Sunday 29th August 2021 at approximately 9 am the Google Equiano Cable arrived on Saint Helena. It was a ‘fresh’ morning as dawn arrived and with it the Teliri Cable Ship. https://www.saint.fm/googles-equiano-fibre-optic-cable-lands-on-st-helena/ As the buoy with the reference to the cable washed up on the black sand of Ruperts Beach and was retrieved by…